A 1 MW solar plant, expandable to 3 MW, next to an eco-resort in Brazil's Atlantic Forest. Santa Isabel, São Paulo, Brazil.

150,000 m²of land, half forest and half open land
7.5 haof open land available for the plant
1 MW → 3 MWphase 1 and expansion on the same land
5.27 GWhof clean energy per year after the expansion, the consumption of about 2,580 households
The place

A rare territory with infrastructure in place

150,000 m² in Santa Isabel, Greater São Paulo. Half is Atlantic Forest with waterfalls, rivers, lakes and trails. The other half is open land, where the solar plant will be built.

Aerial view
Aerial view
Waterfall
Waterfall
Natural pools
Natural pools
50 kmfrom downtown São Paulo
20 minfrom Guarulhos International Airport (GRU)
500 Mbpsfiber optics and grid power on site
3 million Lof mineral water per month
The vision

Two fronts, one territory

Forest eco-resort

  • 8 capsule-style suites in the first phase
  • Share model: one week per year, lifelong and transferable
  • Waterfalls, rivers, lakes and trails in the Atlantic Forest

Solar plant

  • On already open land, with no forest clearing
  • Monthly revenue under multi-year contracts
  • Clean power for the resort as well

Tourism brings visibility and purpose. Energy brings predictable revenue.

The solar resource

Good, steady sun all year round

1,350
kWh per installed kWp, per year
  • Above Shanghai and Munich on the same database
  • Weakest month only 16% below average
  • 656 m altitude: mild temperatures, better yield

Comparison · kWh/kWp per year

Petrolina (NE Brazil)1,549
Beijing (China)1,546
Santa Isabel · Jungle X1,365
Shanghai (China)1,289
Munich (Germany)1,230

Source: PVGIS 5.3 (European Commission, JRC). Fixed structure, 14% losses. Comparison on the ERA5 database.

The plan

Start with 1 MW, grow to 3 MW

Phase 1

1 MW plant + self-sufficient resort

  • 1.3 MWp · 1 MW AC
  • + 60 kWp at the resort
  • 2.3 to 2.6 ha
  • 1.76 GWh per year (~860 households)
Phase 2

Expansion to 3 MW

  • 3.9 MWp · 3 MW AC
  • 7 to 8 ha (the whole open area)
  • 5.27 GWh per year (~2,580 households)
Open land available: ~7.5 ha
Phase 1Phase 2

Phase 1 takes one third of the open land. The expansion uses the rest, with the layout to be confirmed in the field survey.

The model

How energy becomes revenue

The Jungle X plant generates the energy
Neoenergia Elektro's grid carries it
Homes and businesses subscribe and pay less on their bills
Monthly revenue for the plant
Sustainability

Clean energy on preserved land

No forest clearedThe plant goes only on open land
Half kept as forestAbout 75,000 m² of preserved forest
100% solar resortPowered by its own plant
Protected waterSprings, reuse and natural sanitation
RestorationBiodiversity with public indicators
CommunityLocal jobs and suppliers
The proposal

The partnership we propose

We are looking for a partner in equipment, engineering and capital.

What we are looking for

  • Equipment: modules, inverters, structures and storage
  • Engineering and technology: design, construction (EPC), monitoring and operation
  • Capital: equity in the plant's project company (SPV)

What Jungle X brings

  • Land with open area and infrastructure
  • Local development: permits, grid connection and customers
  • A showcase project 20 min from Brazil's main international airport
  • Phased entry: 1 MW now, 3 MW next
Next steps
Grid-access request to Neoenergia Elektro
Field survey and plant layout
Quotes and final financial model
Partnership structure and project company
Materials for partners

Get the project presentation

Fill in the form to unlock the full presentation and the one-page summary, in PDF, in three languages.

PDF
Partner presentation12 slides · PDF · PT · EN · 中文
PDF
One-page summary1 page · PDF · PT · EN · 中文

Your details are used only to contact you about the project.

Thank you. The files are now available.

Partner presentationOther languages: PT中文
Download · EN
One-page summaryOther languages: PT中文
Download · EN